<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Piling Blog for Piling Contractors&#187; Projects</title>
	<atom:link href="http://mkpiling.co.uk/blog/category/projects/feed/" rel="self" type="application/rss+xml" />
	<link>http://mkpiling.co.uk/blog</link>
	<description>MK Piling has an enviable reputation in the UK construction industry.</description>
	<lastBuildDate>Fri, 14 Sep 2012 13:35:32 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.4</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>MK Piling (North West) &#8211; Ground Source Heat</title>
		<link>http://mkpiling.co.uk/blog/2009/08/mk-piling-north-west-ground-source-heat/</link>
		<comments>http://mkpiling.co.uk/blog/2009/08/mk-piling-north-west-ground-source-heat/#comments</comments>
		<pubDate>Wed, 26 Aug 2009 13:21:23 +0000</pubDate>
		<dc:creator>Harvey Banks</dc:creator>
				<category><![CDATA[Projects]]></category>

		<guid isPermaLink="false">http://mkpiling.1int.co.uk/blog/?p=32</guid>
		<description><![CDATA[MK Piling (North West) are currently conducting trials in conjunction with Groundtherm and Hecol at our premises in Oldham.
Installed is a 5kW Ground source pump which can provide heating up to 35/40 degrees and a maximum cooling of 8 degrees.  The case study involved installing driven steel cased cast in situ piles, which transfer the energy from [...]]]></description>
			<content:encoded><![CDATA[<p>MK Piling (North West) are currently conducting trials in conjunction with Groundtherm and Hecol at our premises in Oldham.</p>
<p>Installed is a 5kW Ground source pump which can provide heating up to 35/40 degrees and a maximum cooling of 8 degrees.  The case study involved installing driven steel cased cast in situ piles, which transfer the energy from the ground to the heating/cooling fan coils located in our offices.</p>
<p>The efficiency can not be confirmed until the case study progresses further, however early indications are exceeding expectations.</p>
<p>This technology is at the forefront of renewable energy and can be incorporated in any new/build or extension where piling is required.</p>
]]></content:encoded>
			<wfw:commentRss>http://mkpiling.co.uk/blog/2009/08/mk-piling-north-west-ground-source-heat/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Niyod Construction Nigeria &#8211; Ibom Tropicana Site</title>
		<link>http://mkpiling.co.uk/blog/2009/08/niyod-construction-nigeria-ibom-tropicana-site/</link>
		<comments>http://mkpiling.co.uk/blog/2009/08/niyod-construction-nigeria-ibom-tropicana-site/#comments</comments>
		<pubDate>Wed, 26 Aug 2009 13:07:18 +0000</pubDate>
		<dc:creator>Harvey Banks</dc:creator>
				<category><![CDATA[Projects]]></category>

		<guid isPermaLink="false">http://mkpiling.1int.co.uk/blog/?p=29</guid>
		<description><![CDATA[
Niyod Construction Nigeria, have increased their fleet of Piling rigs which now includes 5 Banut rigs.

2 of which are working on the project at Makako while the other 3 rigs are working on a newly secured contract for AKWA Ibom State Government/Silverbird Group which involves piling for the Ibom Tropicana Resort Complex.
The piling works for a [...]]]></description>
			<content:encoded><![CDATA[<p style="text-align: center;"><img class="aligncenter size-medium wp-image-41" title="12082009245" src="http://mkpiling.1int.co.uk/blog/wp-content/uploads/2009/08/12082009245-300x225.jpg" alt="12082009245" width="300" height="225" /></p>
<p>Niyod Construction Nigeria, have increased their fleet of Piling rigs which now includes 5 Banut rigs.</p>
<p><img class="alignleft size-medium wp-image-40" title="12082009243" src="http://mkpiling.1int.co.uk/blog/wp-content/uploads/2009/08/12082009243-300x225.jpg" alt="12082009243" width="300" height="225" /></p>
<p>2 of which are working on the project at Makako while the other 3 rigs are working on a newly secured contract for AKWA Ibom State Government/Silverbird Group which involves piling for the Ibom Tropicana Resort Complex.</p>
<p>The piling works for a new Shopping Mall, Cineplex and Hotel are being overseen by Aim Consultants consists of approximately 2,000 350mm x 350mm pre-cast concrete piles, driven to depth of approximately 22 metres.</p>
]]></content:encoded>
			<wfw:commentRss>http://mkpiling.co.uk/blog/2009/08/niyod-construction-nigeria-ibom-tropicana-site/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Niyod Construction Nigeria (Lagos)</title>
		<link>http://mkpiling.co.uk/blog/2009/08/niyod-construction-nigeria-lagos-2/</link>
		<comments>http://mkpiling.co.uk/blog/2009/08/niyod-construction-nigeria-lagos-2/#comments</comments>
		<pubDate>Wed, 26 Aug 2009 12:52:26 +0000</pubDate>
		<dc:creator>Harvey Banks</dc:creator>
				<category><![CDATA[Projects]]></category>

		<guid isPermaLink="false">http://mkpiling.1int.co.uk/blog/?p=25</guid>
		<description><![CDATA[Niyod Construction have completed piling works on the contract at Makako, Yaba, Lagos, which was overseen by the Lagos Division of Ove Arrup.
Niyod, successfully installed 1,500 No. 350mm x 350mm pre-cast concrete piles driven to depths of 33 metres, on time and within budget.
As a result Niyod have secured another contract on the same project [...]]]></description>
			<content:encoded><![CDATA[<p>Niyod Construction have completed piling works on the contract at Makako, Yaba, Lagos, which was overseen by the Lagos Division of Ove Arrup.</p>
<p>Niyod, successfully installed 1,500 No. 350mm x 350mm pre-cast concrete piles driven to depths of 33 metres, on time and within budget.</p>
<p>As a result Niyod have secured another contract on the same project for an additional 255 piles, to be commenced shortly.</p>
]]></content:encoded>
			<wfw:commentRss>http://mkpiling.co.uk/blog/2009/08/niyod-construction-nigeria-lagos-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
