Bid-Rigging Contractors To Face Lower Penalties

September 1, 2009 by katieperry · Comments Off
Filed under: Piling News 

When the story bid rigging in the public sector broke over 18 months ago, it again raised the issues of inefficient tendering in the public sector and cover pricing. Cover pricing is a progress where a potential bidder and a client agree that the bidder will  tender an massively over priced bid without any intention of carrying out the work, in order to satisfy client requirements for a certain amount of competition and ultimately keep costs low.

At the time, leading industry experts claimed that private sector clients were well ahead of the public sector, mainly due to the fact that the government procures projects based on low price rather than quality and reputation.

The scandal prompted calls for an inquiry by the Office of Fair Trading, as piling contractors, and many other industry sectors felt the current situation was illegitimate.

A report in the Sunday Times revealed that the construction companies that co-operate with the OFT, will face much more lenient penalties.

MK Piling (North West) – Ground Source Heat

August 26, 2009 by Harvey Banks · Comments Off
Filed under: Projects 

MK Piling (North West) are currently conducting trials in conjunction with Groundtherm and Hecol at our premises in Oldham.

Installed is a 5kW Ground source pump which can provide heating up to 35/40 degrees and a maximum cooling of 8 degrees.  The case study involved installing driven steel cased cast in situ piles, which transfer the energy from the ground to the heating/cooling fan coils located in our offices.

The efficiency can not be confirmed until the case study progresses further, however early indications are exceeding expectations.

This technology is at the forefront of renewable energy and can be incorporated in any new/build or extension where piling is required.

Niyod Construction Nigeria – Ibom Tropicana Site

August 26, 2009 by Harvey Banks · Comments Off
Filed under: Projects 

12082009245

Niyod Construction Nigeria, have increased their fleet of Piling rigs which now includes 5 Banut rigs.

12082009243

2 of which are working on the project at Makako while the other 3 rigs are working on a newly secured contract for AKWA Ibom State Government/Silverbird Group which involves piling for the Ibom Tropicana Resort Complex.

The piling works for a new Shopping Mall, Cineplex and Hotel are being overseen by Aim Consultants consists of approximately 2,000 350mm x 350mm pre-cast concrete piles, driven to depth of approximately 22 metres.

Niyod Construction Nigeria (Lagos)

August 26, 2009 by Harvey Banks · Comments Off
Filed under: Projects 

Niyod Construction have completed piling works on the contract at Makako, Yaba, Lagos, which was overseen by the Lagos Division of Ove Arrup.

Niyod, successfully installed 1,500 No. 350mm x 350mm pre-cast concrete piles driven to depths of 33 metres, on time and within budget.

As a result Niyod have secured another contract on the same project for an additional 255 piles, to be commenced shortly.

Piling, Underpinning and Construction Sectors Expect a Boost, as House Prices Stabilize

August 26, 2009 by katieperry · Comments Off
Filed under: Piling News 

The Royal Institute of Chartered Surveyors (RICS) 2009 Housing Survey,revealed that the housing market is on the road to recovery ,albeit from historic lows.

More and more people are registering their interest in buying property, while the relative number of new properties available is still at an all time low. As a consequence RICS expect house prices to initially stabilize and begin to increase towards to beginning of next year.

The report revealed, that the number of chartered surveyors declaring a rise in new clients, has increased for the eighth consecutive month. The survey also found that over 50% of all surveyors that took part, felt that as house prices continue to stabilize, new developments will start again and subsequently, construction industries such as piling, underpinning and contracting as a whole will experience growth.

Chartered Surveyor, James Heath, commented: “Ultimately, we have experienced an uplift in the number client enquiries we have recieved, over the last quarter.Consequently, I do feel that the historic lows we have experienced over the last year will not be repeated into 2010.Yet, it is vital to remember that the stabilization of property prices, has been a direct  result of the lack of new properties being built. If the property industry is ever going to fully recover, development work needs to begin again. ”

Piling Work Has Begun For the 2012 Olympics

August 25, 2009 by katieperry · Comments Off
Filed under: Piling News 

When the news broke that London had succeed in its bid for the 2012 Olympics, mass hysteria hit the capital. However, when the dust began to settle, our attention turned to the implications of taking on such a huge responsibility and how the UK’s construction industry would cope – anyone remember the Millennium Dome debacle?!

However, recent pictures released by The Olympic Delivery Authority (ODA) confirm that from piling to underpinning  the construction of the 2012 Olympic Village is well underway.

Piling work has begun

Piling work has begun

The village will hold the ‘big five’ main areas of the Olympic Stadium, Aquatics Centre, Olympic Village, VeloPark and the International Broadcast Centre/Main Press Centre (IBC/MPC).

While initial plans for the Olympic village have been scaled down as a consequence of the recession, it will still be a sizeable development. Recent images reveal there will be space for nearly 20,000 beds, housed in eleven residential areas which will be converted into houses eventually. There are also plans for over 10 ha of recreational space, again which will be used productively after the games.

Matthew James, who worked at the Commonwealth Games held in Manchester 2003 comments: “The Athlete’s Village was such an important part of the games in 2003. The sophistication of that construction and the success of the development process, really set the tone for the whole event.”

Currently, the Olympic Village is providing employment for just over one thousand workers , however, this figure is expected to increase to just over four thousand as the games approach. Piling work has begun on all the major blocks and work on the Aquatics Centre is scheduled to start next month.

Welcome to the New MK Piling Blog

August 24, 2009 by katieperry · Comments Off
Filed under: Piling News 

Welcome to the new MK Piling Blog!

Having been in the industry for a number of years, we have earned an enviable reputation as one of the construction industry’s market leading piling specialists.

On this blog, we aim to track trends in construction, property and housing, giving our readers unrivalled access inside the UK’s construction industry.

Please feel free to comment on any of our posts and we look forward to hearing your views.

Regards,

The MK Piling Team

Complex Anchor Pile Project Completed

April 28, 2009 by Harvey Banks · Comments Off
Filed under: Uncategorized 

MK Piling (North West) Ltd has just successfully completed an unusual and complex Anchor Pile Project in East Sussex.

Soil Nailing

Full case study…

For further information on Ground Anchors – Soil Nailing services from MK Piling (North West)

Please Contact

David Hayes on 07796991195

dmhayes1@sky.com

Soil Nailing: Completed Pile A

Soil Nailing: Completed Pile B

Niyod Construction Nigeria (Lagos)

March 12, 2009 by Harvey Banks · Comments Off
Filed under: Uncategorized 

Niyod Construction are currentley Installing 1,500 350×350 pre-cast piles driven to 33mts.

Niyod Construction are currentley Installing 1,500 350×350 pre-cast piles driven to 33mts.

The project is being carried out at Makoko , Yaba , Lagos . The project is being overseen by the Lagos division of Ove Arrup. The project will be completed on time and within the budget .

Niyod have 3 Banut machines within their fleet , 2 of which are working on this project.

Banut

 Full case study…

« Previous Page