<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Piling Blog for Piling Contractors&#187; Grundomat Pile Driving</title>
	<atom:link href="http://mkpiling.co.uk/blog/tag/grundomat-pile-driving/feed/" rel="self" type="application/rss+xml" />
	<link>http://mkpiling.co.uk/blog</link>
	<description>MK Piling has an enviable reputation in the UK construction industry.</description>
	<lastBuildDate>Fri, 14 Sep 2012 13:35:32 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.4</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Grundomat Pile Driving Hammer</title>
		<link>http://mkpiling.co.uk/blog/2010/11/grundomat-pile-driving-hammer/</link>
		<comments>http://mkpiling.co.uk/blog/2010/11/grundomat-pile-driving-hammer/#comments</comments>
		<pubDate>Wed, 24 Nov 2010 11:56:11 +0000</pubDate>
		<dc:creator>Harvey Banks</dc:creator>
				<category><![CDATA[Grundomat Driven Piles]]></category>
		<category><![CDATA[Grundomat Pile Driving]]></category>

		<guid isPermaLink="false">http://mkpiling.1int.co.uk/blog/?p=102</guid>
		<description><![CDATA[Before beginning on any piling task, the location and ground condition must have been thoroughly researched to make sure that it is safe to proceed. Prefabricated ERW steel tubes are used to install piles and additional tubes can be added if needed. Dry concrete mix, or driving plug, is inserted into the starter tube, which [...]]]></description>
			<content:encoded><![CDATA[<p>Before beginning on any piling task, the location and ground condition must have been thoroughly researched to make sure that it is safe to proceed. Prefabricated ERW steel tubes are used to install piles and additional tubes can be added if needed. Dry concrete mix, or driving plug, is inserted into the starter tube, which is the initial tube with a pointed end.</p>
<p>Resistance is created at the driving end by electrically welding additional tubes to the original tubes. The resistance needed is calculated and measured in millimetres movements per second (the piling set.) The piles are then put into place from the pile head with a self-compacting concrete mix. </p>
<p>Grundomat piles can be used for a range of applications including underpinning, foundation piles for lightweight structures i.e. extensions, conservatories, fence post foundations and instrumentation holes</p>
]]></content:encoded>
			<wfw:commentRss>http://mkpiling.co.uk/blog/2010/11/grundomat-pile-driving-hammer/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
